| Sr. No. |
Name of Experiment |
| 1. |
Performing chain surveying with length less than one chain. |
| 2. |
Performing chain surveying with length more than one chain. |
| 3. |
Performing chain surveying along with offset measurement. |
| 4. |
Performing chain surveying along with offset measurement by using open cross staff. |
| 5. |
Introduction to Prismatic compass and measurement of bearings. |
| 6. |
Performing compass surveying and calculation of included angle. |
| 7. |
Project on chain and compass traverse survey.
|
| 8. |
Introduction to dumpy level and calculation of R.L. of various points. |
| 9. |
Performing differential levelling and finding out gradient between two points. |
| 10. |
Project on contour survey. |
| 11. |
Introduction to vernier theodolite and performing methods of repetation for finding horizontal angle. |